{"id":464,"date":"2020-12-06T09:12:04","date_gmt":"2020-12-06T09:12:04","guid":{"rendered":"https:\/\/smartcompletions.net\/en\/docs\/well-completions\/screens-icd-aicd\/icd-aicd\/"},"modified":"2020-12-06T09:20:56","modified_gmt":"2020-12-06T09:20:56","slug":"icd-aicd","status":"publish","type":"docs","link":"https:\/\/smartcompletions.net\/en\/?docs=well-completions\/screens-icd-aicd\/icd-aicd","title":{"rendered":"ICD\/AICD"},"content":{"rendered":"\n<p>In flow control devices (ICD) or autonomos inflow control device (AICD), which improves oil recovery, can be integrated with Secure to improve process efficiency of the well production<\/p>\n\n\n\n<p>In flow control devices (ICDs) help maintain uniform inflow rates, respectively, across the entire length of the interval in openhole completions, even in the presence of permeability variations and thief zones.<\/p>\n\n\n\n<p>Produced fluid enters the production tubing through the ICD. In high-permeability or high-pressure zones, the higher fluid velocity causes the ICD to exert higher backpressure than in less productive zones. Consequently low-productivity zones are stimulated to produce more than in conventional screen completions, minimizing the risk of bypassing reserves and increasing hydrocarbon recovery.<\/p>\n\n\n\n<p>Moreover, the ICD dramatically reduces water and gas rates when these breakthrough phases have higher mobility than the oil.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"644\" height=\"509\" src=\"https:\/\/smartcompletions.net\/en\/wp-content\/uploads\/2020\/12\/ICD.png\" alt=\"\" class=\"wp-image-469\" srcset=\"https:\/\/smartcompletions.net\/en\/wp-content\/uploads\/2020\/12\/ICD.png 644w, https:\/\/smartcompletions.net\/en\/wp-content\/uploads\/2020\/12\/ICD-300x237.png 300w\" sizes=\"(max-width: 644px) 100vw, 644px\" \/><\/figure>\n","protected":false},"featured_media":0,"parent":430,"menu_order":1,"comment_status":"open","ping_status":"closed","template":"","doc_tag":[],"class_list":["post-464","docs","type-docs","status-publish","hentry"],"comment_count":0,"_links":{"self":[{"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/docs\/464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/types\/docs"}],"replies":[{"embeddable":true,"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=464"}],"version-history":[{"count":1,"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/docs\/464\/revisions"}],"predecessor-version":[{"id":470,"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/docs\/464\/revisions\/470"}],"up":[{"embeddable":true,"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/docs\/430"}],"prev":[{"title":"Screens","link":"https:\/\/smartcompletions.net\/en\/?docs=well-completions\/screens-icd-aicd\/screens","href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=\/wp\/v2\/docs\/463"}],"wp:attachment":[{"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=464"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/smartcompletions.net\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fdoc_tag&post=464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}